Several existing dilapidated and abandoned buildings needed to be removed, while the land itself featured heavy contours which posed additional challenges. In addition, the renovated municipal building’s numerous additions and adaptations resulted in multiple boilers and air conditioning systems, for which maintenance costs had steadily increased.īHA faced several challenges on the two-acre site positioned between Gettysburg Road and a Norfolk Southern rail line in Cumberland County. ![]() During this time, various departments moved out of Township facilities into leased spaces at significant additional cost. The current municipal building, built in 1936, had been expanded twice. The need for additional space had been evident for a long time. A portion of the 10.6-acre site will eventually be used as a passive-use park tied to the surrounding neighborhoods by connecting paths. ![]() The Board of Commissioners asked that the new facility include an emergency operations center, space for community activities and meetings, and an area equipped with a wireless Internet connection, which would be open to Township residents. Lower Allen Township needed a new Municipal Services Center to more efficiently accommodate police, fire, and emergency medical services and Township administrative offices.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |